How to control the cleanliness of oval gaksets?

1、 Clean control during the production process

Environmental requirements: The cleanliness of the production workshop should be at least ISO level 7 (≥ 0.5 μ m particles ≤ 352000 particles/m ³); Temperature and humidity control: 22 ± 2 ℃/55 ± 5% (anti-static adsorption particles).

Surface treatment process: (electrolytic polishing) 316L material surface roughness Ra ≤ 0.8 μ m (eliminating micro pits and dirt accumulation); (Passivation treatment) nitric acid+hydrofluoric acid solution to remove free iron ions (to prevent subsequent oxidation pollution).

2、 Packaging and Storage Standards

Inner packaging: double-layer vacuum aluminum plated bag (anti-static)

Storage environment: Inert gas cabinet with relative humidity ≤ 40%

Access tool: specialized fluororubber gloves (powder free)

Proper packaging is essential for maintaining the cleanliness and surface condition of metal ring gaskets during transportation and storage. Protective materials and suitable packaging methods help prevent scratches, moisture exposure, and contamination. Learn more about metal ring gasket packaging protection and the recommended storage practices.

3、 Cleaning verification before installation

Solvent cleaning: Medical grade isopropanol ultrasonic cleaning (removal rate of particles larger than 5 μ m ≥ 99%), acetone is prohibited.

Cleanliness testing: (VDA19.1 standard) membrane weighing method for detecting impurities (0 tolerance for particles>200 μ m); (White glove test) Wipe the surface of the gasket without visible residue.

Cleanliness is only one aspect of gasket quality verification. Before installation, RTJ gaskets should also be checked for dimensional accuracy, material compliance, hardness, and visible surface defects. Read our guide to the RTJ gasket incoming inspection procedure for a more comprehensive quality inspection process.

4、 Anti pollution measures during installation process

Flange pretreatment: Use non-woven fabric dipped in ethanol to wipe the groove in one direction (do not rub back and forth).

Installation action specification: After the oval gasket is inserted into the groove, it is forbidden to rotate (to avoid metal scratching and debris generation); Bolt diagonal pre tightening (torque deviation ≤ 5%) to prevent gasket displacement.

Oval gaskets cannot be directly touched with bare hands, as sweat and salt can cause stress corrosion cracking! Microscopic cracks after compression deformation are prone to accumulate dirt and grime, therefore they cannot be reused. It is also prohibited to blow dry gas, as high-speed airflow can cause secondary pollution of metal particles.

In addition to keeping the gasket clean, the flange groove must also be properly prepared before assembly. Dirt, corrosion, scratches, and residual gasket fragments can affect the metal-to-metal sealing contact. Learn more about RTJ gasket pre-installation preparation, including flange groove inspection and cleaning.

The content of this article is for learning exchange and reference only. The information is sourced from publicly available online channels. Readers are advised to discern and make their own judgments. This website does not assume any responsibility.

For more products, please click:

R GASKET

RX GASKET

BX GASEKT

IX GASKET

SBX GASKET

NON STANDARD

OTHER

Scroll to Top